09.06.2018

04.06.2018

The delivery of equipment for gas purification, drop collector and drop collector chamber was completed within the project "Modernization of gas purification system of converter № 1”of metallurgical plant of the Arab Republic of Egypt.

Design documentation was developed by Research Institute "CEMEQMASH".

The equipment was shipped by sea through the port of Novorossiysk.

Back