Executed Projects
Supplied equipment and performed service
-
-
CJSC “Tamanneftegaz”
Air dryer of the compressor – 1 PC.
-
Paul Wurth for JSC "Arcelor Mittal Steel Temirtau»
End gas cooler – 1 pc.
-
LLC “Coper Trade”
Supply of combined feeder "left" for 3,6x4,0m
-
LLP “Kazzinc”
Manufacturing and supply of welded-in kiln tire 4,0х60 m
Manufacturing and supply of hydraulic thrust roller for the kiln 4,0х60 m
-
OJSC «Yaroslavl technical carbon»
The supply of component parts for drying drums БСК-40.
Narrow roller with axle assembled – 4 pcs.
Wide roller with axle assembled – 6 pcs.
-
LLC «Magnitogorsk Cement Refractory Plant»
- Implementation of complex expansion project of cement production with construction of two kilns Ø 4,5x125 m and Ø 4,5x129 m and new raw material workshop, consisting of 3 mills of CEMEQ development.The amount of supplied equipment is 3000 tons
-
Implementation of current and general overhaul of the main technological equipment within the Contract, signed till the end of 2017.
- Supply of sub-recuperator section of rotary kiln ø 4.5 m, the outlet grids gap 8 mm.
- Repairing of rotary kiln №5 with the replacement of sub-recuperator section and repair of the chain zone. Manufacturing and installation of briquetting line.
- Supply of five sets of outlet grids with 8mm slit for mills
- Supply the frame of roller support for the kiln Ø 4х125 m
- Manufacturing and supply of the frame 400 tons of roller supports according to the drawings of research institute "CemeqMash".